



Project Overview: Designed for the high-end seaside resort sector, this project provides modular holiday cabins adapted to climates characterised by high temperatures, high humidity and high salt fog. The project is being implemented in two phases, with 15 units to be delivered in Phase 1, and Phase 2 to be scaled up depending on operational performance.

Key Features of the Proposal: The main structure utilises a light-gauge steel and modular assembly system, shipped in full containers to the Port of Aden, Yemen; dry construction methods combined with on-site quick-connect plumbing and electrical installations minimise the impact of high temperatures and humidity on the construction schedule and quality.

Project Status: Currently in the proposal evaluation stage. The objective is to become the core supplier for the 25 holiday cabins in this project and to establish it as a showcase project for the Middle Eastern coastal resort market.